FEVE Coatings, both solvent-based and water-based types, can be directly applied to concrete surfaces that are fully cured, which is typically 28 days after installation. However, concrete surfaces are very porous and will absorb a high percentage of the coating applied to bare concrete. Since the main function of FEVE coatings is a weatherable finish and these coatings are higher in cost than conventional concrete finishes, we recommend the use of a primer-sealer as the first coat on bare concrete.

No tags for this post.
No tags for this post.